action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home2/gecfla/public_html/wp-includes/functions.php on line 6114GEC provided geotechnical engineering for the design of a 1,124-foot long pedestrian bridge crossing John Young Parkway. The bridge includes a 220-foot long single span and a total of approximately 900 feet of elevated walkway on both ends of the bridge. The main span of the bridge is supported by pre-stressed precast concrete piles and the elevated walkway is founded on shallow spread footings. The finished bridge completes one of the key Trail Opportunity corridors outlined in the City\u2019s Bicycle and Pedestrian Master Plan.<\/p>\n<\/div>
VHB<\/p>\n<\/div><\/div><\/div>
City of Kissimmee<\/p>\n<\/div><\/div><\/div>
\u2022 Bridge foundations
\n\u2022 Stormwater ponds<\/p>\n<\/div><\/div><\/div>