Roadway
Wekiva Parkway PD&E Study,Line & Grade & Final Design
GEC provided geotechnical engineering and contamination assessment services for the PD&E and Line & Grade studies on the 25-mile toll road alignment that completes the beltway around Orlando. The $1.7 billion project is a joint effort between the Florida Department of Transportation and the Central Florida Expressway Authority. GEC provided geotechnical services for the Final Design of Segments 1A, 2B, 2C, 3A, 3B, 5 and 7A


